Modular Water Distribution System – Orissa

Project Incharge:Ramesh Guntha, Nitin Kumar M.
Project Incharge:Mr. Audithya V., Mr. Harikrishnan, Mr. Aravind, Br. Vikram, Mr. Sreekanth, and Mr. Tinu
Modular Water Distribution System – Orissa

Thematic Area: Water & Sanitation

Project Guide(s):  Mr. Ramesh Guntha, Mr. Nitin Kumar, Mr. Audithya V., Mr. Harikrishnan, Mr. Aravind, Br. Vikram, Mr. Sreekanth, and Mr. Tinu, Center for Wireless Networks and Applications

Amrita Partners: 1st year PhD students, Center for Wireless Networks & Applications

Village: Guptapada, Orissa

Project Duration: 4 months

Identified Challenge & Aim:

For many villagers in India, collecting and carrying water is part of their daily routine. However, villagers often have to walk several kilometers to collect water necessary for themselves and their families, sometimes walking several times a day. Many villagers, especially women, collect and carry between 200 and 500 liters of water per day for their families and cattle.Recognizing the hardship of the villagers, faculty, staff, and students from the Amrita Center for Wireless Networks and Applications and Amrita Self Reliant Villages (ASeRve) worked together to build a water distribution system for more effective water use and management. 

The Study/Innovation:

The team conducted semi-structured interviews to understand social, cultural, economic, political, environmental, and technological factors and features in the village. They also went around the village and made a resource map which gave the team a clear picture of the sustainable resources available in the village and helped them understand the quantity of the resources available. The team and villagers then had several group discussions and meetings resulting in a modular design for a water distribution system. They decided to design it in a way so that water is distributed through a pipe system which connects to an overhead Sintex steel water tank that currently stores 5,000 liters of water. To lay out the pipe network, the team and villagers manually dug two trenches– one 700 meters long and 2 feet deep and another 550 meters long and 1 foot deep. The entire group also dug the foundation pit for the water tank’s steel structure. Plans are in place to build another 5,000 liter water tank in the future and to commence water conservation awareness initiatives in the village. Clocking in over 16,000 hours, the team, along with the villagers, installed a piping network, 37 taps, and a 5,000 liter water tanks. Water is now easily accessible to all 62 homes.

Addresses Sustainable Development Goals:

Related Projects

Paraptosis: a Newer Approach to Target Cancer
Paraptosis: a Newer Approach to Target Cancer
Centres for Antimicrobial Optimisation Network (CAMO-NET) Optimising Antimicrobial Use To Address The Global Challenge of Antimicrobial Resistance
Centres for Antimicrobial Optimisation Network (CAMO-NET) Optimising Antimicrobial Use To Address The Global Challenge of Antimicrobial Resistance
Super resolution of Images for Breast Cancer from Mammography Images
Super resolution of Images for Breast Cancer from Mammography Images
Predictive Modeling of Complex IT systems
Predictive Modeling of Complex IT systems
Development of Microbial Consortia for Effective Composting
Development of Microbial Consortia for Effective Composting
Admissions Apply Now