Amrita Vishwa Vidyapeetham’s Amritapuri campus has made significant strides in rainwater harvesting and water conservation through a series of infrastructural developments across its premises. These measures support sustainable water management and reflect the campus’s commitment to environmental stewardship.
Project Progress Overview
Engineering College (Plot 1)
- Division A-1: Located at the front of the college, 56.3% of the brick masonry work is complete, aiming to capture rainwater effectively.
- Divisions A-2 and B: These divisions have fully completed masonry work, enhancing rainwater collection and storage capabilities.
- Division C and E: Division C is planned for future water conservation work, while Division E, behind the college, has completed fencing, creating a secure environment for rainwater collection.
Boys Hostel (Plot 2)
- Division B: Located near the STP (Sewage Treatment Plant), with 93% completion, set for finishing on July 15, 2023, optimizing rainwater capture.
- Division C: Positioned behind the PG block, awaiting project initiation.
Ground Area (Plot 3)
- Division D: Near the sorting center, fully equipped with rainwater conservation structures, while other areas are scheduled for future development.
Remarks and Future Steps
These initiatives exemplify Amrita’s commitment to sustainable rainwater harvesting. The completion of multiple divisions and planned expansions aim to enhance rainwater capture and retention, promoting effective conservation and creating a model for similar institutions.