Publication Type : Journal Article
Publisher : International Journal of Pure and Applied Mathematics
Source : International Journal of Pure and Applied Mathematics, Volume 114, Number 6, p.235 - 239 (2017)
Url : https://acadpubl.eu/jsi/2017-114-5/articles/2/27.pdf
Campus : Coimbatore
School : School of Engineering
Department : Mathematics
Year : 2017
Abstract : Production scheduling of a single machine with release and due dates in a cold forging organisation involving multiple product is a complex problem. The making of products has major practical issues with the availability of raw material at high setup time and unexpected tool breakage time. The current machine utilization is on and average 20% of the overall production in a8 hours shift for a week. In this paper, a heuristic approach to improve the efficiency of the machine by reducing the setup time and improving the lead time of products have been proposed.
Cite this Research Publication : A. N. A. N. T. A. P. R. A. V. E. E. N. K. U. MVR, A, D. A. V. I. D. M. A. X. I. M. G. U. R. U., and .HARIHARAN, S., “Single-Machine Scheduling with Release Dates and Family Setup Times”, International Journal of Pure and Applied Mathematics, vol. 114, pp. 235 - 239, 2017.