Back close

Investigation of compatibility between portland pozzolana cement and admixtures in high performance concrete

Project Incharge:Dr. K. M. Mini and Dhanya Sathyan

Duration of the Project: 3 Years

Investigation of compatibility between portland pozzolana cement and admixtures in high performance concrete

The principal investigators of the project titled “Investigation of compatibility between portland pozzolana cement and admixtures in high performance concrete,” are Dr. K. M. Mini and Dhanya Sathyan. The duration of the project is 3 years.

Related Projects

AI Co-Design of 5G Base Station Hardware and Software
AI Co-Design of 5G Base Station Hardware and Software
Design and Development of an IoT Based Smart Irrigation and Fertilization System for Chilli Farming
Design and Development of an IoT Based Smart Irrigation and Fertilization System for Chilli Farming
Run-time Analysis of Temporal Constrained Objects
Run-time Analysis of Temporal Constrained Objects
Virtual laboratory NMEICT project
Virtual laboratory NMEICT project
Radar Systems 
Radar Systems 
Admissions Apply Now