Back close

Feasibility Study on Coastal Reservoir Concept to Impound Netravati River Flood Waters : A Sustainable Strategy for Water Resource Development

School: School of Engineering, Coimbatore

Project Incharge:Dr. Sreevalsa, Prof. Subbarao
Funded by:BWSSB, Govt of Karnataka

Funding Agency: BWSSB, Govt of Karnataka

Feasibility Study on Coastal Reservoir Concept to Impound Netravati River Flood Waters : A Sustainable Strategy for Water Resource Development

The project titled “Feasibility Study on Coastal Reservoir Concept to Impound Netravati River Flood Waters : A Sustainable Strategy for Water Resource Development” is funded by BWSSB, Govt of Karnataka.  Dr. Sreevalsa, Prof. Subbarao are the investigators of the project. 

Duration of the Project: 1 Year

Related Projects

Smart Water Management
Smart Water Management
Development of a method to Control Ultraviolet Radiation in welding Processes
Development of a method to Control Ultraviolet Radiation in welding Processes
Prototype Design of Low-Cost Biomass to Liquid Fuel System
Prototype Design of Low-Cost Biomass to Liquid Fuel System
SDR based Modem for Spacecraft Telemetry reception, Telecommanding and Ranging Operations
SDR based Modem for Spacecraft Telemetry reception, Telecommanding and Ranging Operations
Development of Methodologies for Detection of Digital Contents Plagiarism
Development of Methodologies for Detection of Digital Contents Plagiarism
Admissions Apply Now