Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Impacts of recent El-Nino Southern Oscillation (ENSO) on the Water-Food-Energy Nexus in South Asia (Indian PI)
Impacts of recent El-Nino Southern Oscillation (ENSO) on the Water-Food-Energy Nexus in South Asia (Indian PI)
Design, synthesis and characterization of modified peptide nucleic acids having electrochemical/fluorescent markers
Design, synthesis and characterization of modified peptide nucleic acids having electrochemical/fluorescent markers
Development of Flux TIG, Pulsed TIG Technology for Dissimilar weldments and Corrosion Studies
Development of Flux TIG, Pulsed TIG Technology for Dissimilar weldments and Corrosion Studies
Online Testing of IC Engines
Online Testing of IC Engines
Statistical Semantic Networks for Concept and Document Relatedness
Statistical Semantic Networks for Concept and Document Relatedness
Admissions Apply Now