Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Use of geo-textile fabric and pervious concrete to prevent coastal erosion in sandy soil beaches of Kerala
Use of geo-textile fabric and pervious concrete to prevent coastal erosion in sandy soil beaches of Kerala
Hardware Based Network Intrusion Detection System (NIDS) for High Speed Networks
Hardware Based Network Intrusion Detection System (NIDS) for High Speed Networks
An Intelligent Controller Based Shunt Hybrid Filter for Harmonic Mitigation in Adjustable Speed Drives
An Intelligent Controller Based Shunt Hybrid Filter for Harmonic Mitigation in Adjustable Speed Drives
Design and Analysis of Cryptographically Secure Power Generators
Design and Analysis of Cryptographically Secure Power Generators
IoT-Based Humidity and Temperature Monitoring System for Improved Mushroom Farming
IoT-Based Humidity and Temperature Monitoring System for Improved Mushroom Farming
Admissions Apply Now