Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Smart Pharmacist For Visually Impaired
Smart Pharmacist For Visually Impaired
Prototype Design of Low-Cost Biomass to Liquid Fuel System
Prototype Design of Low-Cost Biomass to Liquid Fuel System
Influence of Boron Carbide Addition on Neutron Shielding Ability of Cement Mortar Mix
Influence of Boron Carbide Addition on Neutron Shielding Ability of Cement Mortar Mix
Investigation on High Performance Nano Adhesive Bonding of Ultra High Temperature Resistant Polymer and its Performance under Space Environments
Investigation on High Performance Nano Adhesive Bonding of Ultra High Temperature Resistant Polymer and its Performance under Space Environments
Hybrid Composite for Aviation, Space and Defence Applications
Hybrid Composite for Aviation, Space and Defence Applications
Admissions Apply Now