Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Autonomous Visual and Wireless Sensor Network based Smart Evacuation System
Autonomous Visual and Wireless Sensor Network based Smart Evacuation System
Development and Scale-Up of Plunging Hollow Jet, Venturi and Sudden Expansion Type Aerators
Development and Scale-Up of Plunging Hollow Jet, Venturi and Sudden Expansion Type Aerators
Super resolution of Images for Breast Cancer from Mammography Images
Super resolution of Images for Breast Cancer from Mammography Images
Development of Ultra High Temperature Resistance Polymeric Nano Composite for Long Distance Space Applications
Development of Ultra High Temperature Resistance Polymeric Nano Composite for Long Distance Space Applications
Synthesis and Characterization of Functionally Graded Copper Metal Matrix Composites
Synthesis and Characterization of Functionally Graded Copper Metal Matrix Composites
Admissions Apply Now