Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Shape Optimization of Optical Structures
Shape Optimization of Optical Structures
Multi-User Detection in Sporadic 3GPP Massive M2M Communication via Compressed Sensing
Multi-User Detection in Sporadic 3GPP Massive M2M Communication via Compressed Sensing
Detailed computational modelling and optimization of natural draught cook stoves
Detailed computational modelling and optimization of natural draught cook stoves
Design and development of smart composite structures for active vibration and shape control
Design and development of smart composite structures for active vibration and shape control
Behzad-Vizing Conjecture on Graph Coloring for Product Graphs
Behzad-Vizing Conjecture on Graph Coloring for Product Graphs
Admissions Apply Now