Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Feature based Transfer Function Design for Volume Rendering
Feature based Transfer Function Design for Volume Rendering
Processing and Characterization of Heat Treated Functionally Graded Aluminium (A359) Composites for Aerospace Applications
Processing and Characterization of Heat Treated Functionally Graded Aluminium (A359) Composites for Aerospace Applications
Hardware Based Network Intrusion Detection System (NIDS) for High Speed Networks
Hardware Based Network Intrusion Detection System (NIDS) for High Speed Networks
Design and Development of Low Profile Substrate Integrated Dielectric Resonator Antenna for Space Applications
Design and Development of Low Profile Substrate Integrated Dielectric Resonator Antenna for Space Applications
SDR based Modem for Spacecraft Telemetry reception, Telecommanding and Ranging Operations
SDR based Modem for Spacecraft Telemetry reception, Telecommanding and Ranging Operations
Admissions Apply Now