Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Burning velocity measurment of biodiesel components using divergent chennal technique and Heat Flux Method
Burning velocity measurment of biodiesel components using divergent chennal technique and Heat Flux Method
Appraisal of Seismic hazard in Delhi and Assessment of Preparedness Level among the Community
Appraisal of Seismic hazard in Delhi and Assessment of Preparedness Level among the Community
Design, synthesis and characterization of modified peptide nucleic acids having electrochemical/fluorescent markers
Design, synthesis and characterization of modified peptide nucleic acids having electrochemical/fluorescent markers
SDR based Modem for Spacecraft Telemetry reception, Telecommanding and Ranging Operations
SDR based Modem for Spacecraft Telemetry reception, Telecommanding and Ranging Operations
An automated system to mitigate loss of life at unmanned level crossings
An automated system to mitigate loss of life at unmanned level crossings
Admissions Apply Now