Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Residual Stress Measurements in Machining of Titanium Alloys
Residual Stress Measurements in Machining of Titanium Alloys
Development of Surface-Modified Carbon Steel by employing Advanced Surface Engineering Technique
Development of Surface-Modified Carbon Steel by employing Advanced Surface Engineering Technique
Machine Fault Identification : A Unified Approach
Machine Fault Identification : A Unified Approach
Statistical Semantic Networks for Concept and Document Relatedness
Statistical Semantic Networks for Concept and Document Relatedness
High Temperature Thermoplastic Hybrid Composite for Higher Tensile Strength and Impact Resistance
High Temperature Thermoplastic Hybrid Composite for Higher Tensile Strength and Impact Resistance
Admissions Apply Now