Exercises / Term Work Assignments:
- Types of estimate – plinth area method – cubic rate method – unit rate method – bay method – approximate quantity from bill method – comparison method – cost from materials and labour – preparation of detailed estimate
- Preparation of detailed estimate using Centre line method
- Preparation of detailed estimate using Long wall – short wall method
- Preparation of detailed estimate for C.C Structures.
- Preparation of detailed estimate for Steel
- Preparation of detailed estimate for roads
- Preparation of detailed estimate for sanitary and water supply works
- Preparation of valuation
- Assignments on:
- market survey of basic materials
- rate analysis
- specifications
- simple