Back close

Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

Start Date: Wednesday, Jan 01,2014

End Date: Monday, Jul 31,2017

School: School of Engineering, Coimbatore

Project Incharge:Dr. R. Ramkrishnan
Funded by:Government of Karnataka, BWSSB
Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore

The project titled “Coastal reservoir concept to impound Netravati River flood waters: A sustainable strategy for water resource development for Mangalore and Bangalore” is funded by Government of Karnataka, BWSSB.  Mr. R. Ramkrishnan is the investigator of the project

The Project is completed in July 2017.

Related Projects

Synthesis and Characterization of Functionally Graded Copper Metal Matrix Composites
Synthesis and Characterization of Functionally Graded Copper Metal Matrix Composites
Mitigation of dam induced flood disaster due to hydrological extremes (CoPI)
Mitigation of dam induced flood disaster due to hydrological extremes (CoPI)
Development of Energy Saver for Induction Motors
Development of Energy Saver for Induction Motors
Novel Nanocomposites with Unusually High Conductivity for Microwave Absorption Development of Carbon-Intrinsically Conducting Polymer (C-ICP) and C-ICP Metal Nanocomposites
Novel Nanocomposites with Unusually High Conductivity for Microwave Absorption Development of Carbon-Intrinsically Conducting Polymer (C-ICP) and C-ICP Metal Nanocomposites
Process Monitoring and Control of Ultra-precision Machining of Titanium Alloys
Process Monitoring and Control of Ultra-precision Machining of Titanium Alloys
Admissions Apply Now